PROJECT UPDATE AS OF OCTOBER 2007


Project Updates
OCTOBER 2007
Completed Projects:
  • Banyan Ridge
  • Mandala West
  • Mandala North
  • Mandala South
Upcoming Project:
Mandala 2
Activity: Road Tracing
Ongoing Projects:
  • The Ranch
    -Gate and Guard House
    -Land Development
  • Mandala East
    -Land Development
  • Spine Road
    -Phase 2A - 1st 2 Lane
    -Concreting of 3rd Lane
------ The Ranch Gate and Guardhouse ------
Accomplishment 95.68%
The Ranch Land Development
Accomplishment 97% (As of October 8, 2007)
Drainage System 90%
Water System 98%
Road Concreting 100%
Sodding Works 70%
*Sodding and Block Preparation
*Rectification Works
------ CONSTRUCTION OF HOUSE MODELS AT THE RANCH ------
HOUSE MODEL ACCOMPLISHMENT
Upland 71%
Ridge Deck 69.46%
Hartford 77%
UPLAND HOUSE MODEL (Blk 3 Lot 6)
*CHB Laying
*Installation of roof framing for Upland
RIDGEDECK HOUSE MODEL (Blk3 Lot 3)
*CHB Laying
*Construction of entrance stairs of Ridgedeck
*Construction of CHB wall partitions at 2nd floor of Ridgedeck
HARTFORD HOUSE MODEL (Blk1 Lot 5)
*Wall plastering and installation of concrete mouldings
*Stairs at Hartford

----- Mandala East Land Development -----
Accomplishment 97% (As of October 8, 2007)
Drainage System 100%
Water System 81.29%
Road Construction 100%
Masonry Barrier 100%
Road 17: Concreted
Road 14 Concreting
----- Spine Road -----
Accomplishment (As of October 8, 2007)
  1. PHASE 2A 97.54%
    Drainage System 92.37%
    Road Works 100%
  2. 3RD LANE 73%
    Road Works 82%
1st & 2nd Stage Road Concreting at The Ranch Entrance
1st Stage Road Concreting at Mandala Phase 2 Entrance
Base Course Preparation and Formworks for Curb & Gutter: Center Island